
PPC – Power Plant Controller
The system to
_ comply with the CEI 0-16 regulation, attachments O and T
_ensure direct measurements of the plant’s performance to transmit them to the Distributor System Operator (DSO) through protocol IEC 61850
The system to
_ comply with the CEI 0-16 regulation, attachments O and T
_ensure direct measurements of the plant’s performance to transmit them to the Distributor System Operator (DSO) through protocol IEC 61850